Nagra-TIE3107-tape-sb 维修电路原理图.pdf
《Nagra-TIE3107-tape-sb 维修电路原理图.pdf》由会员分享,可在线阅读,更多相关《Nagra-TIE3107-tape-sb 维修电路原理图.pdf(3页珍藏版)》请在收音机爱好者资料库上搜索。
1、APR 2003 ELECTRONIC SERVICE BULLETIN TIE 31-07 KUDELSKI GROUP NAGRAVISION CH-1033-CHESEAUX TEL 021/732-0101 1 FAX 021/732-0100 DOUBLE MODULOMETER Reason: Monitoring both channels using 2 needles instead of 1 needle. Important: This modification is very critical to execute as we are working with extr
2、emely fragile open instrument meters. It is recommended to execute this modification only at the factory. The new software version eprom V2.10 or higher is needed Modulometer kit P/N 7131 114 000 Parts: Description Qty 0119 155 034 Modulometer green 1 (Needle end must be painted in green.) 3001 023
3、236 Screw M2x16 2 3321 002 034 Shim M2 4 3201 002 036 Nut M2 6 0131 114 001 Window 1 0131 114 002 Motor cover 1 9131 325 000 Pcb 1 8131 404 000 Wiring double meter 1 Old modulometer needle must be painted red. Procedure: 1 window 2 motor housing 3 modulo (Green) 4 screw M2x16 5 nut M2 6 elastic shim
4、 7 wiring 8 PCB A nut (pan) B nut M2 C nut M2 Remove the keyboard from the Nagra-V: Disconnect the ribbon cables as well as the potentiometer connections. Remove the 2 screws from the bottom as well as the 4 nuts on the left and right sides. Remove the keyboard PCB: Disconnect the brown flex from th
5、e main switch. Disconnect the modulometer. Remove the 7 screws. RadioFans.CN 收音机爱 好者资料库APR 2003 ELECTRONIC SERVICE BULLETIN TIE 31-07 KUDELSKI GROUP NAGRAVISION CH-1033-CHESEAUX TEL 021/732-0101 2 FAX 021/732-0100 Remove the old modulometer: Remove the 2 nuts (A) from the modulometer window, remove
6、the window and remove the 2 nuts. Carefully take out the modulometer and unsolder the white and red-white wire. Remove from the rear of the keyboard the 2 screws (No 4) and replace them by the 2 longer screws M2x16. Paint the needle end red. Installing the red modulo meter (D): Before installation,
7、by using a soldering iron, make a small groove along the black plastic housing of the red modulometer. See picture. The groove sits on the lower part of the housing. See white arrow. The groove must be large enough to pass a wire. Carefully insert the red modulometer and lock it by using 2 elastic s
8、hims (No 6) and 2 nuts (No 5). Verify over the full scale that the needle does not touch the housing. Adjust the mechanical position of the needle versus the scale so that it sits on the small line on the left side of 40 dB. On the rear side of the red modulometer, solder the PCB. See picture. From
9、the rear side, insert a red-white wire (60 mm) in the groove of the red modulometer. Solder the red-white wire on the PCB position E5. Solder the previously removed wiring on the added PCB (E3 is white, E4 is red-white) Installing the green modulometer (No 3): Carefully remove the black plastic hous
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Nagra-TIE3107-tape-sb 维修电路原理图 Nagra TIE3107 tape sb 维修 电路 原理图