Zenith-DVB611-dvd-sm 维修电路原理图.pdf
《Zenith-DVB611-dvd-sm 维修电路原理图.pdf》由会员分享,可在线阅读,更多相关《Zenith-DVB611-dvd-sm 维修电路原理图.pdf(63页珍藏版)》请在收音机爱好者资料库上搜索。
1、SERVICE MANUALProduct Type: DVD VIDEO PLAYERChassis: DP-10 (MD)Manual Series: DVB611Manual Part #: 3829RHP051MModel Line: DProduct Year: 2006Summary 1Cabinet & Main Chassis 2Electrical 3Parts List 4Published March 2006by Technical PublicationsZenith Electronics Corporation201 James Record RoadHuntsv
2、ille, Alabama 35824-1513Copyright 2006 by Zenith Electronics CorporationPrinted in U.S.AModel Series: CONTENTSDVB611.MODEL : DVB611SERVICE MANUALRadioFans.CN 收音机爱 好者资料库CONTENTSSECTION 1 . . . .SUMMARYSECTION 2 . . . .CABINET & MAIN CHASSISSECTION 3 . . . .ELECTRICALSECTION 4 . . . .REPLACEMENT PARTS
3、 LISTRadioFans.CN 收音机爱 好者资料库SECTION 1SUMMARYCONTENTSPRODUCT SAFETY SERVICING GUIDELINES FOR VIDEO PRODUCTS. 1-3SERVICING PRECAUTIONS. 1-4 General Servicing Precautions Insulation Checking Prodedure Electrostatically Sensitive DevicesSERVICE INFORMATION FOR EEPROM. 1-5SPECIFICATIONS. 1-61-21-3CAUTION
4、 : DO NOT ATTEMPT TO MODIFY THIS PRODUCT IN ANY WAY,NEVER PERFORM CUSTOMIZED INSTALLATIONS WITHOUT MANUFAC-TURERS APPROVAL. UNAUTHORIZED MODIFICATIONS WILL NOT ONLYVOID THE WARRANTY, BUT MAY LEAD TO YOUR BEING LIABLE FOR ANYRESULTING PROPERTY DAMAGE OR USER INJURY.SERVICE WORK SHOULD BE PERFORMED ON
5、LY AFTER YOU ARETHOROUGHLY FAMILIAR WITH ALL OF THE FOLLOWING SAFETYCHECKS AND SERVICING GUIDELINES. TO DO OTHERWISE,INCREASES THE RISK OF POTENTIAL HAZARDS AND INJURY TO THEUSER.WHILE SERVICING, USE AN ISOLATION TRANSFORMER FOR PROTEC-TION FROM A.C. LINE SHOCK.SAFETY CHECKSAFTER THE ORIGINAL SERVIC
6、E PROBLEM HAS BEEN CORRCTED. ACHECK SHOULD BE MADE OF THE FOLLOWING.SUBJECT : FIRE & SHOCK HAZARD1. BE SURE THAT ALL COMPONENTS ARE POSITIONED IN SUCH A WAYAS TO AVOID POSSIBILITY OF ADJACENT COMPONENT SHORTS.THIS IS ESPECIALLY IMPORTANT ON THOSE MODULES WHICH ARETRANSPORTED TO AND FROM THE REPAIR S
7、HOP.2. NEVER RELEASE A REPAIR UNLESS ALL PROTECTIVE DEVICESSUCH AS INSULATORS, BARRIERS, COVERS, SHIELDS, STRAIN RELIEFS, POWER SUPPLY CORDS, AND OTHER HARDWARE HAVEBEEN REINSTALLED PER ORIGINAL DESIGN. BE SURE THAT THESAFETY PURPOSE OF THE POLARIZED LINE PLUG HAS NOT BEENDEFEATED.3. SOLDERING MUST
8、BE INSPECTED TO DISCOVER POSSIBLE COLDSOLDER JOINTS, SOLDER SPLASHES OR SHARP SOLDER POINTS.BE CERTAIN TO REMOVE ALL LOOSE FOREIGN PARTICLES.4. CHECK FOR PHYSICAL EVIDENCE OF DAMAGE OR DETERIORATIONTO PARTS AND COMPONENTS. FOR FRAYED LEADS, DAMAGEDINSULATION (INCLUDING A.C. CORD). AND REPLACE IF NEC
9、ESSARYFOLLOW ORIGINAL LAYOUT, LEAD LENGTH AND DRESS.5. NO LEAD OR COMPONENT SHOULD TOUCH A RECIVING TUBE ORA RESISTOR RATED AT 1 WATT OR MORE. LEAD TENSION AROUNDPROTRUNING METAL SURFACES MUST BE AVOIDED.6. ALL CRITICAL COMPONENTS SUCH AS FUSES, FLAMEPROOFRESISTORS, CAPACITORS, ETC. MUST BE REPLACED
10、 WITH EXACTFACTORY TYPES, DO NOT USE REPLACEMENT COMPONENTSOTHER THAN THOSE SPECIFIED OR MAKE UNRECOMMENDED CIR-CUIT MODIFICATIONS.7. AFTER RE-ASSEMBLY OF THE SET ALWAYS PERFORM AN A.C.LEAKAGE TEST ON ALL EXPOSED METALLIC PARTS OF THE CABI-NET, (THE CHANNEL SELECTOR KNOB, ANTENNA TERMINALS. HAN-DLE
11、AND SCREWS) TO BE SURE THE SET IS SAFE TO OPERATEWITHOUT DANGER OF ELECTRICAL SHOCK. DO NOT USE A LINE ISOLATION TRANSFORMER DURING THIS TEST USE AN A.C. VOLT-METER, HAVING 5000 OHMS PER VOLT OR MORE SENSITIVITY, INTHE FOLLOWING MANNER; CONNECT A 1500 OHM 10 WATT RESIS-TOR, PARALLELED BY A .15 MFD.
12、150.V A.C TYPE CAPACITORBETWEEN A KNOWN GOOD EARTH GROUND (WATER PIPE, CON-DUIT, ETC.) AND THE EXPOSED METALLIC PARTS, ONE AT A TIME.MEASURE THE A.C. VOLTAGE ACROSS THE COMBINATION OF 1500 OHM RESISTOR AND .15 MFD CAPACITOR. REVERSE THE A.C. PLUGAND REPEAT A.C. VOLTAGE MEASUREMENTS FOR EACH EXPOSED
13、METALLIC PART. VOLTAGE MEASURED MUST NOT EXCEED 75VOLTS R.M.S. THIS CORRESPONDS TO 0.5 MILLIAMP A.C ANYVALUE EXCEEDING THIS LIMIT CONSTITUTES A POTENTIAL SHOCKHAZARD AND MUST BE CORRECTED IMMEDIATELY.SUBJECT: GRAPHIC SYMBOLSTHE LIGHTNING FLASH WITH APROWHEAD SYMBOL. WITHINAN EQUILATERAL TRIANGLE, IS
14、 INTENDED TO ALERT THESERVICE PERSONNEL TO THE PRESENCE OF UNINSULATED“DANGEROUS VOLTAGE” THAT MAY BE OF SUFFICIENT MAG-NITUDE TO CONSTITUTE A RISK OF ELECTRIC SHOCK.THE EXCLAMATION POINT WITHIN AN EQUILATERAL TRIAN-GLE IS INTENDED TO ALERT THE SERVICE PERSONNEL TOTHE PRESENCE OF IMPORTANT SAFETY IN
15、FORMATION INSERVICE LITERATURE.SUBJECT : X-RADIATION1. BE SURE PROCEDURES AND INSTRUCTIONS TO ALL SERVICE PER-SONNEL COVER THE SUBJECT OF X-RADIATION. THE ONLY POTEN-TIAL SOURCE OF X-RAYS IN CURRENT T.V. RECEIVERS IS THE PIC-TURE TUBE. HOWEVER, THIS TUBE DOES NOT EMIT X-RAYS WHENTHE HIGH VOLTAGE IS
16、AT THE FACTORY SPECIFIED LEVEL. THE PROPER VALUE IS GIVEN IN THE APPLICABLE SCHEMATIC. OPERA-TION AT HIGHER VOLTAGES MAY CAUSE A FAILURE OF THE PIC-TURE TUBE OR HIGH VOLTAGE SUPPLY AND, UNDER CERTAIN CIR-CUMSTANCES, MAY PRODUCE RADIATION IN EXCESS OF DESIR-ABLE LEVELS.2. ONLY FACTORY SPECIFIED C.R.T
17、. ANODE CONNECTORS MUST BEUSED. DEGAUSSING SHIELDS ALSO SERVE AS X-RAY SHIELD INCOLOR SETS, ALWAYS RE-INSTALL THEM.3. IT IS ESSNTIAL THAT SERVICE PERSONNEL HAVE AVAILABLE ANACCURATE AND RELIABLE HIGH VOLTAGE METER. THE CALIBRATION OF THE METER SHOULD BE CHECKED PERIODICALLYAGAINST A REFERENCE STANDA
18、RD, SUCH AS THE ONE AVAILABLEAT YOUR DISTRIBUTOR.4. WHEN THE HIGH VOLTAGE CIRCUITRY IS OPERATING PROPERLYTHERE IS NO POSSIBILITY OF AN X-RADIATION PROBLEM. EVERYTIME A COLOR CHASSIS IS SERVICED. THE BRIGHTNESS SHOULDBE RUN UP AND DOWN WHILE MONITORING THE HIGH VOLTAGEWITH A METER TO BE CERTAIN THAT
19、THE HIGH VOLTAGE DOESNOT EXCEED THE SPECIFIED VALUE AND THAT IT IS REGULATINGCORRECTLY, WE SUGGEST THAT YOU AND YOUR SERVICE ORGA-NIZATION REVIEW TEST PROCEDURES SO THAT VOLTAGE REGU-LATION IS ALWAYS CHECKED AS A STANDARD SERVICING PROCE-DURE. AND THAT THE HIGH VOLTAGE READING BE RECORDER ONEACH CUS
20、TOMERS INVOICE.5. WHEN TROUBLESHOOTING AND MAKING TEST MEASUREMENTS INA PRODUCT WITH A PROBLEM OF EXCESSIVE HIGH VOLTAGE,AVOID BEING UNNECESSARILY CLOSE TO THE PICTURE TUBE ANDTHE HIGH VOLTAGE SUPPLY. DO NOT OPERATE THE PRODUCTLONGER THAN IS NECESSARY TO LOCATE THE CAUSE OF EXCESSIVE VOLTAGE.6. REFE
21、R TO HV. B+ AND SHUTDOWN ADJUSTMENT PROCEDURES DESCRIBED IN THE APPROPRIATE SCHEMATIC AND DIAGRAMS(WHERE USED).SUBJECT: IMPLOSION1. ALL DIRECT VIEWED PICTURE TUBES ARE EQUIPPED WITH AN INTEGRAL IMPLOSION PROTECTION SYSTEM, BUT CARE SHOULD BETAKEN TO AVOID DAMAGE DURING INSTALLATION, AVOIDSCRATCHING
22、THE TUBE. IF SCRATCHED REPLACE IT.2. USE ONLY RECOMMENDED FACTORY REPLACEMENT TUBES.SUBJECT : TIPS ON PROPER INSTALLATION1. NEVER INSTALL ANY PRODUCT IN A CLOSED-IN RECESS, CUBBY-HOLE OR CLOSELY FITTING SHELF SPACE. OVER OR CLOSE TOHEAT DUCT, OR IN THE PATH OF HEATED AIR FLOW.2. AVOID CONDITIONS OF
23、HIGH HUMIDITY SUCH AS: OUTDOOR PATIOINSTALLATIONS WHERE DEW IS A FACTOR, NEAR STEAM RADIA-TORS WHERE STEAM LEAKAGE IS A FACTOR, ETC.3. AVOID PALCEMENT WHERE DRAPERIES MAY OBSTRUCT REARVENTING. THE CUSTOMER SHOULD ALSO AVOID THE USE OF DEC-ORATIVE SCARVES OR OTHER COVERINGS WHICH MIGHTOBSTRUCT VENTIL
24、ATION.4. WALL AND SHELF MOUNTED INSTALLATIONS USING A COMMER-CIAL MOUNTING KIT. MUST FOLLOW THE FACTORY APPROVED MOUNTING INSTRUCTIONS A PRODUCT MOUNTED TO A SHELF ORPLATFORM MUST RETAIN ITS ORIGINAL FEET (OR THE EQUIVALENTTHICKNESS IN SPACERS) TO PROVIDE ADEQUATE AIR FLOW ACROSS THE BOTTOM, BOLTS O
25、R SCREWS USED FOR FASTENERSMUST NOT TOUCH ANY PARTS OR WIRING. PERFORM LEAKAGETEST ON CUSTOMIZED INSTALLATIONS.5. CAUTION CUSTOMERS AGAINST THE MOUNTING OF A PRODUCT ONSLOPING SHELF OR A TILTED POSITION, UNLESS THE PRODUCT ISPROPERLY SECURED.6. A PRODUCT ON A ROLL-ABOUT CART SHOULD BE STABLE ON ITSM
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Zenith-DVB611-dvd-sm 维修电路原理图 Zenith DVB611 dvd sm 维修 电路 原理图