NAD-C325BEE-int-sm 维修电路原理图.pdf
《NAD-C325BEE-int-sm 维修电路原理图.pdf》由会员分享,可在线阅读,更多相关《NAD-C325BEE-int-sm 维修电路原理图.pdf(37页珍藏版)》请在收音机爱好者资料库上搜索。
1、NADSERVICE MANUALC 325BEESTEREOAMPLIFIERC 325BEESTEREOAMPLIFIERRadioFans.CN 收音机爱 好者资料库TABLE OF CONTENTS DESCRIPTION P A G E SERVICE CAUTION3-4REAR PANEL/FRONT PANEL VIEW.5SPECIFICATIONS.6-7 WIRING DIAGRAM8 BLOCK DIAGRAM. .9-14 ALIGNMENT PROCEDURE.15 SCHEMATICS.16-19 PCB LAYOUT 20-23 TROUBLE SHOOTING
2、 GUIDE.24 ELECTRICAL PARTS LIST.25-34 EXPLODED VIEW.35 EXPLODED VIEW PARTS LIST.36 2 PROTECT IC CHANGE .37 RadioFans.CN 收音机爱 好者资料库PRODUCT SAFETY SERVICING GUIDELINES CAUTION : DO NOT ATTEMPT TO MODIFY THIS PRODUCT INANY WAY. NEVER PERFORM CUSTOMIZED INSTALLATIONSWITHOUT MANUFACTURERS APPROVAL. UNAUT
3、HORIZEDMODIFICATIONS WILL NOT ONLY VOID THE WARRANTY, BUTMAY LEAD TO YOUR BEING LIABLE FOR ANY RESULTINGPROPERTY DAMAGE OR USER INJURY.SERVICE WORK SHOULD BE PERFORMED ONLY AFTER YOUARE THOROUGHLY FAMILIAR WITH ALL OF THE FOLLOWINGSAFETY CHECKS AND SERVICING GUIDELINES. TO DOOTHERWISE, INCREASES THE
4、 RISK OF POTENTIAL HAZARDSAND INJURY TO THE USER. WHILE SERVICING, USE AN ISOLATION TRANSFORMER FORPROTECTION FROM AC LINE SHOCK.SAFETY CHECKSAFTER THE ORIGINAL SERVICE PROBLEM HAS BEENCORRECTED. A CHECK SHOULD BE MADE OF THEFOLLOWING.SUBJECT : FIRE & SHOCK HAZARD1. BE SURE THAT ALL COMPONENTS ARE P
5、OSITIONED INSUCH A WAY AS TO AVOID POSSIBILITY OF ADJACENTCOMPONENT SHORTS. THIS IS ESPECIALLY IMPORTANTON THOSE MODULES WHICH ARE TRANSPORTED TO ANDFROM THE REPAIR SHOP. 2. NEVER RELEASE A REPAIR UNLESS ALL PROTECTIVEDEVICES SUCH AS INSULATORS, BARRIERS, COVERS,SHIELDS, STRAIN RELIEFS, POWER SUPPLY
6、 CORDS, ANDOTHER HARDWARE HAVE BEEN REINSTALLED PERORIGINAL DESIGN. BE SURE THAT THE SAFETY PURPOSEOF THE POLARIZED LINE PLUG HAS NOT BEEN DEFEATED.3. SOLDERING MUST BE INSPECTED TO DISCOVER POSSIBLECOLD SOLDER JOINTS, SOLDER SPLASHES OR SHARPSOLDER POINTS. BE CERTAIN TO REMOVE ALL LOOSEFOREIGN PART
7、ICLES.4. CHECK FOR PHYSICAL EVIDENCE OF DAMAGE ORDETERIORATION TO PARTS AND COMPONENTS. FORFRAYED LEADS, DAMAGED INSULATION (INCLUDING ACCORD). AND REPLACE IF NECESSARY FOLLOW ORIGINALLAYOUT, LEAD LENGTH AND DRESS.5. NO LEAD OR COMPONENT SHOULD TOUCH A RECEIVINGTUBE OR A RESISTOR RATED AT 1 WATT OR
8、MORE. LEADTENSION AROUND PROTRUDING METAL SURFACES MUSTBE AVOIDED.6. ALL CRITICAL COMPONENTS SUCH AS FUSES,FLAMEPROOF RESISTORS, CAPACITORS, ETC. MUST BEREPLACED WITH EXACT FACTORY TYPES, DO NOT USEREPLACEMENT COMPONENTS OTHER THAN THOSESPECIFIED OR MAKE UNRECOMMENDED CIRCUITMODIFICATIONS.7. AFTER R
9、E-ASSEMBLY OF THE SET ALWAYS PERFORM ANAC LEAKAGE TEST ON ALL EXPOSED METALLIC PARTS OFTHE CABINET, (THE CHANNEL SELECTOR KNOB, ANTENNATERMINALS. HANDLE AND SCREWS) TO BE SURE THE SETIS SAFET TO OPERATE WITHOUT DANGER OF ELECTRICALSHOCK. DO NOT USE A LINE ISOLATION TRANSFORMERDURING THIS TEST USE AN
10、 AC VOLTMETER, HAVING 5000OHMS PER VOLT OR MORE SENSITIVITY, IN THEFOLLOWING MANNER; CONNECT A 1500 OHM 10 WATTRESISTOR, PARALLELED BY A .15 MFD, 150V AC TYPECAPACITOR BETWEEN A KNOWN GOOD EARTH GROUND(WATER PIPE, CONDUIT, ETC.) AND THE EXPOSEDMETALLIC PARTS, ONE AT A TIME. MEASURE THE AC VOLTAGE AC
11、ROSS THE COMBINATIONOF 1500 OHM RESISTOR AND .15 MFD CAPACITOR. REVERSE THE AC PLUG AND REPEAT AC VOLTAGEMEASUREMENTS FOR EACH EXPOSED METALLIC PART. VOLTAGE MEASURE MUST NOT EXCEED 75 VOLTS R.M.S.THIS CORRESPONDS TO 0.5 MILLIAMP AC ANY VALUEEXCEEDING THIS LIMIT CONSTITUTES A POTENTIALSHOCK HAZARD A
12、ND MUST BE CORRECTED IMMEDIATELY.SUBJECT : GRAPHIC SYMBOLSSUBJECT : TIPS ON PROPER INSTALLATION1. NEVER INSTALL ANY PRODUCT IN A CLOSED-IN RECESS,CUBBYHOLE OR CLOSELY FITTING SHELF SPACE. OVEROR CLOSE TO HEAT DUCT, OR IN THE PATH OF HEATEDAIR FLOW.2. AVOID CONDITIONS OF HIGH HUMIDITY SUCH AS:OUTDOOR
13、 PATIO INSTALLATIONS WHERE DEW IS AFACTOR, NEAR STEAM RADIATORS WHERE STEAMLEAKAGE IS A FACTOR, ETC.3. AVOID PLACEMENT WHERE DRAPERIES MAY OBSTRUCTREAR VENTING. THE CUSTOMER SHOULD ALSO AVOID THEUSE OF DECORATIVE SCARVES OR OTHER COVERINGSWHICH MIGHT OBSTRUCT VENTILATION.4. WALL AND SHELF MOUNTED IN
14、STALLATIONS USING ACOMMERCAL MOUNTING KIT MUST FOLLOW THE FACTORYAPPROVED MOUNTING INSTRUCTIONS A PRODUCTMOUNTED TO A SHELF OR PLATFORM MUST RETAIN ITSORIGINAL FEET (OR THE EQUIVALENT THICKNESS INSPACERS) TO PROVIDE ADEQUATE AIR FLOW ACROSSTHE BOTTOM, BOLTS OR SCREWS USED FOR FASTENERSMUST NOT TOUCH
15、 ANY PARTS OR WIRING. PERFORMLEAKAGE TEST ON CUSTOMIZED INSTALLATIONS.5. CAUTION CUSTOMERS AGAINST THE MOUNTING OF APRODUCT ON SLOPING SHELF OR A TILTED POSITION,UNLESS THE PRODUCT IS PROPERLY SECURED.6. A PRODUCT ON A ROLL-ABOUT CART SHOULD BE STABLEON ITS MOUNTING TO THE CART. CAUTION THECUSTOMER
16、ON THE HAZARDS OF TRYING TO ROLL A CARTWITH SMALL CASTERS ACROSS THRESHOLDS OR DEEPPILE CARPETS.7. CAUTION CUSTOMERS AGAINST THE USE OF A CART ORSTAND WHICH HAS NOT BEEN LISTED BY UNDERWRITERSLABORATORIES, INC. FOR USE WITH THEIR SPECIFICMODEL OF TELEVISION RECEIVER OR GENERICALLYAPPROVED FOR USE WI
17、TH T.V.S OF THE SAME ORLARGER SCREEN SIZE.8. CAUTION CUSTOMERS AGAINST THE USE OF EXTENSIONCORDS, EXPLAIN THAT A FOREST OF EXTENSIONSSPROUTING FROM A SINGLE OUTLET CAN LEAD TODISASTROUS CONSEQUENCES TO HOME AND FAMILY.THE LIGHTNING FLASH WITH ARROWHEAD SYMBOL, WITHIN ANEQUILATERAL TRIANGLE, IS INTEN
18、DED TO ALERT THE USER TO THEPRESENCE OF UNINSULATED “DANGEROUS VOLTAGE” WITHIN THEPRODUCTS ENCLOSURE THAT MAY BE OF SUFFICIENT MAGNITUDE TOCONSTITUTE A RISK OF ELECTRIC SHOCK.THE EXCLAMATION POINT WITHIN AN EQUILATERAL TRIANGLE ISINTENDED TO ALERT THE USER TO THE PRESENCE OF IMPORTANTOPERATING AND M
19、AINTENANCE (SERVICING) INSTRUCTIONS IN THELITERATURE ACCOMPANYING THE APPLIANCESERVICING PRECAUTIONSCAUTION : Before servicing the A/V Receiver covered by thisservice data and its supplements and addends, read and follow theSAFETY PRECAUTIONS. NOTE : if unforeseen circumstancescreate conflict betwee
20、n the following servicing precautions and anyof the safety precautions in this publication, always follow the safetyprecautions.Remember Safety First:General Servicing Precautions1. Always unplug the A/V Receiver AC power cord from the ACpower source before:(1) Removing or reinstalling any component
21、, circuit board,module, or any other assembly.(2) Disconnecting or reconnecting any internal electrical plug orother electrical connection.(3) Connecting a test substitute in parallel with an electrolyticcapacitor.Caution : A wrong part substitution or incorrect polarity installationof electrolytic
22、capacitors may result in an explosion hazard.2. Do not spray chemicals on or near this A/V Receiver or any of itsassemblies.3. Unless specified otherwise in this service data, clean electricalcontacts by applying an appropriate contact cleaning solution tothe contacts with a pipe cleaner, cottontipp
23、ed swab, orcomparable soft applicator.Unless specified otherwise in this service data, lubrication ofcontacts is not required.4. Do not defeat any plug/socket B+ voltage interlocks with whichinstruments covered by this service manual might be equipped.5. Do not apply AC power to this A/V Receiver an
24、d/or any of itselectrical assemblies unless all solid-state device heat sinks arecorrectly installed.6. Always connect test instrument ground lead to the appropriateground before connecting the test instrument positive lead. Alwaysremove the test instrument ground lead last.Insulation Checking Proce
25、dureDisconnect the attachment plug from the AC outlet and turn thepower on. Connect an insulation resistance meter(500V) to theblades of the attachment plug. The insulation resistance betweeneach blade of the attachment plug and accessible conductive parts(Note 1) should be more than 1M-ohm.Note 1 :
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAD-C325BEE-int-sm 维修电路原理图 NAD C325BEE int sm 维修 电路 原理图