NAD-M55-ddp-sm 维修电路原理图.pdf
《NAD-M55-ddp-sm 维修电路原理图.pdf》由会员分享,可在线阅读,更多相关《NAD-M55-ddp-sm 维修电路原理图.pdf(78页珍藏版)》请在收音机爱好者资料库上搜索。
1、SERVICE MANUALSERVICE MANUALM55MODEL : M55 AHSERVICE MANUAL NAD 2010NAD ELECTRONICS INTERNATIONALTORONTOM55DIGITAL DISC PLAYERM55DIGITAL DISC PLAYERDIGITAL DISCPLAYERRadioFans.CN 收音机爱 好者资料库CONTENTSSECTION 1 . . . .SUMMARYSECTION 2 . . . .CABINET CHASSIS NEW LOADERSECTION 3 . . . .ELECTRICALSECTION 4
2、 . . . .MECHANISM (ORIGINAL LOADER)SECTION 5 . . . .REPLACEMENT PARTS LISTRadioFans.CN 收音机爱 好者资料库SECTION 1SUMMARYCONTENTSPRODUCT SAFETY SERVICING GUIDELINES FOR VIDEO PRODUCTS. 1-3SERVICING PRECAUTIONS. 1-4 General Servicing Precautions Insulation Checking Prodedure Electrostatically Sensitive Devic
3、esSPECIFICATIONS. 1-51-21-3CAUTION : DO NOT ATTEMPT TO MODIFY THIS PRODUCT IN ANY WAY,NEVER PERFORM CUSTOMIZED INSTALLATIONS WITHOUT MANUFAC-TURERS APPROVAL. UNAUTHORIZED MODIFICATIONS WILL NOT ONLYVOID THE WARRANTY, BUT MAY LEAD TO YOUR BEING LIABLE FOR ANYRESULTING PROPERTY DAMAGE OR USER INJURY.S
4、ERVICE WORK SHOULD BE PERFORMED ONLY AFTER YOU ARETHOROUGHLY FAMILIAR WITH ALL OF THE FOLLOWING SAFETYCHECKS AND SERVICING GUIDELINES. TO DO OTHERWISE,INCREASES THE RISK OF POTENTIAL HAZARDS AND INJURY TO THEUSER.WHILE SERVICING, USE AN ISOLATION TRANSFORMER FOR PROTEC-TION FROM A.C. LINE SHOCK.SAFE
5、TY CHECKSAFTER THE ORIGINAL SERVICE PROBLEM HAS BEEN CORRCTED. ACHECK SHOULD BE MADE OF THE FOLLOWING.SUBJECT : FIRE & SHOCK HAZARD1. BE SURE THAT ALL COMPONENTS ARE POSITIONED IN SUCH A WAYAS TO AVOID POSSIBILITY OF ADJACENT COMPONENT SHORTS.THIS IS ESPECIALLY IMPORTANT ON THOSE MODULES WHICH ARETR
6、ANSPORTED TO AND FROM THE REPAIR SHOP.2. NEVER RELEASE A REPAIR UNLESS ALL PROTECTIVE DEVICESSUCH AS INSULATORS, BARRIERS, COVERS, SHIELDS, STRAIN RELIEFS, POWER SUPPLY CORDS, AND OTHER HARDWARE HAVEBEEN REINSTALLED PER ORIGINAL DESIGN. BE SURE THAT THESAFETY PURPOSE OF THE POLARIZED LINE PLUG HAS N
7、OT BEENDEFEATED.3. SOLDERING MUST BE INSPECTED TO DISCOVER POSSIBLE COLDSOLDER JOINTS, SOLDER SPLASHES OR SHARP SOLDER POINTS.BE CERTAIN TO REMOVE ALL LOOSE FOREIGN PARTICLES.4. CHECK FOR PHYSICAL EVIDENCE OF DAMAGE OR DETERIORATIONTO PARTS AND COMPONENTS. FOR FRAYED LEADS, DAMAGEDINSULATION (INCLUD
8、ING A.C. CORD). AND REPLACE IF NECESSARYFOLLOW ORIGINAL LAYOUT, LEAD LENGTH AND DRESS.5. NO LEAD OR COMPONENT SHOULD TOUCH A RECIVING TUBE ORA RESISTOR RATED AT 1 WATT OR MORE. LEAD TENSION AROUNDPROTRUNING METAL SURFACES MUST BE AVOIDED.6. ALL CRITICAL COMPONENTS SUCH AS FUSES, FLAMEPROOFRESISTORS,
9、 CAPACITORS, ETC. MUST BE REPLACED WITH EXACTFACTORY TYPES, DO NOT USE REPLACEMENT COMPONENTSOTHER THAN THOSE SPECIFIED OR MAKE UNRECOMMENDED CIR-CUIT MODIFICATIONS.7. AFTER RE-ASSEMBLY OF THE SET ALWAYS PERFORM AN A.C.LEAKAGE TEST ON ALL EXPOSED METALLIC PARTS OF THE CABI-NET, (THE CHANNEL SELECTOR
10、 KNOB, ANTENNA TERMINALS. HAN-DLE AND SCREWS) TO BE SURE THE SET IS SAFE TO OPERATEWITHOUT DANGER OF ELECTRICAL SHOCK. DO NOT USE A LINE ISOLATION TRANSFORMER DURING THIS TEST USE AN A.C. VOLT-METER, HAVING 5000 OHMS PER VOLT OR MORE SENSITIVITY, INTHE FOLLOWING MANNER; CONNECT A 1500 OHM 10 WATT RE
11、SIS-TOR, PARALLELED BY A .15 MFD. 150.V A.C TYPE CAPACITORBETWEEN A KNOWN GOOD EARTH GROUND (WATER PIPE, CON-DUIT, ETC.) AND THE EXPOSED METALLIC PARTS, ONE AT A TIME.MEASURE THE A.C. VOLTAGE ACROSS THE COMBINATION OF 1500 OHM RESISTOR AND .15 MFD CAPACITOR. REVERSE THE A.C. PLUGAND REPEAT A.C. VOLT
12、AGE MEASUREMENTS FOR EACH EXPOSED METALLIC PART. VOLTAGE MEASURED MUST NOT EXCEED 75VOLTS R.M.S. THIS CORRESPONDS TO 0.5 MILLIAMP A.C ANYVALUE EXCEEDING THIS LIMIT CONSTITUTES A POTENTIAL SHOCKHAZARD AND MUST BE CORRECTED IMMEDIATELY.SUBJECT: GRAPHIC SYMBOLSTHE LIGHTNING FLASH WITH APROWHEAD SYMBOL.
13、 WITHINAN EQUILATERAL TRIANGLE, IS INTENDED TO ALERT THESERVICE PERSONNEL TO THE PRESENCE OF UNINSULATED“DANGEROUS VOLTAGE” THAT MAY BE OF SUFFICIENT MAG-NITUDE TO CONSTITUTE A RISK OF ELECTRIC SHOCK.THE EXCLAMATION POINT WITHIN AN EQUILATERAL TRIAN-GLE IS INTENDED TO ALERT THE SERVICE PERSONNEL TOT
14、HE PRESENCE OF IMPORTANT SAFETY INFORMATION INSERVICE LITERATURE.SUBJECT : X-RADIATION1. BE SURE PROCEDURES AND INSTRUCTIONS TO ALL SERVICE PER-SONNEL COVER THE SUBJECT OF X-RADIATION. THE ONLY POTEN-TIAL SOURCE OF X-RAYS IN CURRENT T.V. RECEIVERS IS THE PIC-TURE TUBE. HOWEVER, THIS TUBE DOES NOT EM
15、IT X-RAYS WHENTHE HIGH VOLTAGE IS AT THE FACTORY SPECIFIED LEVEL. THE PROPER VALUE IS GIVEN IN THE APPLICABLE SCHEMATIC. OPERA-TION AT HIGHER VOLTAGES MAY CAUSE A FAILURE OF THE PIC-TURE TUBE OR HIGH VOLTAGE SUPPLY AND, UNDER CERTAIN CIR-CUMSTANCES, MAY PRODUCE RADIATION IN EXCESS OF DESIR-ABLE LEVE
16、LS.2. ONLY FACTORY SPECIFIED C.R.T. ANODE CONNECTORS MUST BEUSED. DEGAUSSING SHIELDS ALSO SERVE AS X-RAY SHIELD INCOLOR SETS, ALWAYS RE-INSTALL THEM.3. IT IS ESSNTIAL THAT SERVICE PERSONNEL HAVE AVAILABLE ANACCURATE AND RELIABLE HIGH VOLTAGE METER. THE CALIBRATION OF THE METER SHOULD BE CHECKED PERI
17、ODICALLYAGAINST A REFERENCE STANDARD, SUCH AS THE ONE AVAILABLEAT YOUR DISTRIBUTOR.4. WHEN THE HIGH VOLTAGE CIRCUITRY IS OPERATING PROPERLYTHERE IS NO POSSIBILITY OF AN X-RADIATION PROBLEM. EVERYTIME A COLOR CHASSIS IS SERVICED. THE BRIGHTNESS SHOULDBE RUN UP AND DOWN WHILE MONITORING THE HIGH VOLTA
18、GEWITH A METER TO BE CERTAIN THAT THE HIGH VOLTAGE DOESNOT EXCEED THE SPECIFIED VALUE AND THAT IT IS REGULATINGCORRECTLY, WE SUGGEST THAT YOU AND YOUR SERVICE ORGA-NIZATION REVIEW TEST PROCEDURES SO THAT VOLTAGE REGU-LATION IS ALWAYS CHECKED AS A STANDARD SERVICING PROCE-DURE. AND THAT THE HIGH VOLT
19、AGE READING BE RECORDER ONEACH CUSTOMERS INVOICE.5. WHEN TROUBLESHOOTING AND MAKING TEST MEASUREMENTS INA PRODUCT WITH A PROBLEM OF EXCESSIVE HIGH VOLTAGE,AVOID BEING UNNECESSARILY CLOSE TO THE PICTURE TUBE ANDTHE HIGH VOLTAGE SUPPLY. DO NOT OPERATE THE PRODUCTLONGER THAN IS NECESSARY TO LOCATE THE
20、CAUSE OF EXCESSIVE VOLTAGE.6. REFER TO HV. B+ AND SHUTDOWN ADJUSTMENT PROCEDURES DESCRIBED IN THE APPROPRIATE SCHEMATIC AND DIAGRAMS(WHERE USED).SUBJECT: IMPLOSION1. ALL DIRECT VIEWED PICTURE TUBES ARE EQUIPPED WITH AN INTEGRAL IMPLOSION PROTECTION SYSTEM, BUT CARE SHOULD BETAKEN TO AVOID DAMAGE DUR
21、ING INSTALLATION, AVOIDSCRATCHING THE TUBE. IF SCRATCHED REPLACE IT.2. USE ONLY RECOMMENDED FACTORY REPLACEMENT TUBES.SUBJECT : TIPS ON PROPER INSTALLATION1. NEVER INSTALL ANY PRODUCT IN A CLOSED-IN RECESS, CUBBY-HOLE OR CLOSELY FITTING SHELF SPACE. OVER OR CLOSE TOHEAT DUCT, OR IN THE PATH OF HEATE
22、D AIR FLOW.2. AVOID CONDITIONS OF HIGH HUMIDITY SUCH AS: OUTDOOR PATIOINSTALLATIONS WHERE DEW IS A FACTOR, NEAR STEAM RADIA-TORS WHERE STEAM LEAKAGE IS A FACTOR, ETC.3. AVOID PALCEMENT WHERE DRAPERIES MAY OBSTRUCT REARVENTING. THE CUSTOMER SHOULD ALSO AVOID THE USE OF DEC-ORATIVE SCARVES OR OTHER CO
23、VERINGS WHICH MIGHTOBSTRUCT VENTILATION.4. WALL AND SHELF MOUNTED INSTALLATIONS USING A COMMER-CIAL MOUNTING KIT. MUST FOLLOW THE FACTORY APPROVED MOUNTING INSTRUCTIONS A PRODUCT MOUNTED TO A SHELF ORPLATFORM MUST RETAIN ITS ORIGINAL FEET (OR THE EQUIVALENTTHICKNESS IN SPACERS) TO PROVIDE ADEQUATE A
24、IR FLOW ACROSS THE BOTTOM, BOLTS OR SCREWS USED FOR FASTENERSMUST NOT TOUCH ANY PARTS OR WIRING. PERFORM LEAKAGETEST ON CUSTOMIZED INSTALLATIONS.5. CAUTION CUSTOMERS AGAINST THE MOUNTING OF A PRODUCT ONSLOPING SHELF OR A TILTED POSITION, UNLESS THE PRODUCT ISPROPERLY SECURED.6. A PRODUCT ON A ROLL-A
25、BOUT CART SHOULD BE STABLE ON ITSMOUNTING TO THE CART. CAUTION THE CUSTOMER ON THE HAZ-ARDS OF TRYING TO ROLL A CART WITH SMALL CASTERS ACROSSTHRESHOLDS OR DEEP PILE CARPETS.7. CAUTION CUSTOMERS AGAINST THE USE OF A CART OR STANDWHICH HAS NOT BEEN LISTED BY UNDERWRITERS LABORATORIES, INC. FOR USE WI
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAD-M55-ddp-sm 维修电路原理图 NAD M55 ddp sm 维修 电路 原理图