1、Theory of Operation: I-Tech Power Supplies Eric Baker Last Edited 9/21/04 This work is intended to describe the operational theory behind the power supplies in the I-tech series of Crown amplifiers. Designers include: Eric Baker, Sergio Busquets-Monge, Ben Carroll, David Evans, and Gerald Stanley. T
2、opology: Phase-modulated, full-bridge, series-resonant converter Control strategy: Constant line current for improved power-factor Circuit Level Block Diagram The basic block diagram appears below as Fig. 1. The stages of power processing include the following: 1) EMI filter: Reduces power line cond
3、ucted noise from the power supply 2) Full-bridge rectifier: Rectifies the AC line providing a DC bulk supply for the full-bridge of switches 3) Impedance matching capacitor bank: Provides charge storage and a high-current low-impedance source 4) Full-bridge switch network: chops the DC bulk voltage
4、in to discrete pulses 5) Series-resonant tank: Works as a constant current source for the main power transformer 6) Step-up transformer: Steps up the voltage from approximately 60V on the primary to the secondary voltage 7) Full-bridge rectifiers: Creates pulsating DC from the high frequency AC coup
5、led through the transformer 8) Secondary energy storage: Serves as an energy storage reserve for the amplifier. Fig. 1. Block diagram of the power supplies EMI Filter SRT T 123 4, 5, 6 78 EMI Filter SRT T 123 4, 5, 6 78 RadioFans.CN 收音机爱 好者资料库 Phase Shift Modulation The core of the converter is made
6、 up of two half-bridges, shown above in 4, which are connected between a positive bulk voltage (Upper Buss) and a return (Lower Buss). The switches, in each half-bridge, alternate in turning on and off, at high frequency (40-41.7kHz), in order to obtain a 50% duty cycle square waveform at each of th
7、e respective center points. One center point (A or the leading leg made up of Q21,23,25,27,29, CH1; R1003=open,R1004=715K (R1006=pot) CH2; R1031=open,R1032=715K (R1034-pot) 4.1.5.2.3. Attach X10 probe (ground clip not needed) to respective channel on the buss bar the red LP/LN wire is, orienting the
8、 probe vertical and NOT leaning against the gate drive PWA. See Figure. 4.1.5.2.4. Power up from a cold start (i.e. 20-25 degrees C) ,and adjust associated OVER LAP / UNDER LAP pot from center. 4.1.5.2.5. Adjust the scope timebase for 50ns/div, 20V/div and tune scope offset and position until the ri
9、sing, upturn corner of the waveform is in center view. 4.1.5.2.6. While viewing the active wave on the scope, adjust the channel pot, watching this corner change from a more rounding feature to just starting to square off some. Stop tuning there, so the wave is more like the photo having a slight ro
10、und corner, not too square. The fans may come on which is ok but , since the unit is open thus heating is more rapid, it is recommended that the adjustment is done within 2 minutes from a room ambient temperature start. 4.1.5.2.7. Alternate, less accurate method: If an AC power meter is available, t
11、hen a power line draw check may be a measurement to ensure one of the two channels isnt consuming the majority of line power sum of the channels. 4.1.5.2.8. For example using an ITECH 6000: Using a line voltage of 120VAC 60Hz, connect an ITECH 6K thru a power meter. With the front panel switched off
12、 and turning on the back breaker, a typical power demand read on the meter might be around 5 watts (reduce readings by 50% for 240V measurements). Then, turning on the front panel power switch, and while waiting for the green “ready” lights to come on the power meter should respond up to about 50 to
13、 60 watts briefly. This is the internal high power supply coming on line before the two channels of the amplifier become awake. Then when the green “ready” lights come on the power meter should then go from the 60 watts to about 190 watt or very low 200 watt range. Here both channels are on line plu
14、s the power supply. 4.1.5.2.9. Turn off the back breaker and then pull out one of the channel Front End PWAs. Turn back on the back breaker and wait for the “green” ready lights to come back on. The power meter would then go from the 60 watts (power supply only) to about 120 watts or so approximate
15、(only one amplifier channel running). Turn off again, replace the first front end PWA and remove the other. If the power readings are within than 20 watts of each other then Over/Under Lap is set properly for each. Over-Lap/Under-Lap probe placement and scope reference of VP(red) node. Scope display
16、 showing proper adjustment of overlap/underlap Upper BCA Gate Drive is new (red) capacitors. Lower one is the original. 4.1.6. Firmware Upgrade / Version Check 4.1.6.1. There are several types of firmware files used in I-Tech amplifiers. Firmware is updated using TCP/IQ utility or System Architect.
17、Firmware versions may be verified using either software package, or via front panel LCD in the “Monitor” menu. Here are the firmware files used in I-Tech. 4.1.6.1.1. Loader: allows network to send new firmware to I-Techs. Filename - Italdr.bin. 4.1.6.1.2. LCD firmware: controls LCD and front panel.
18、Filename - ITDAPP-vx_xxx.bin. 4.1.6.1.3. DSP firmware: handles all audio processing and network communications. Filename - ITAxxxx.bin. 4.1.6.2. What version firmware should I be using? 4.1.6.2.1. Version 1.202 or higher. Older versions do not contain important feature and performance enhancements,
19、such as quieter fan operation, optimized thermal compression, etc. 4.1.6.2.2. As a general rule, if the amplifier is running 1.202 or higher, there is no reason to upgrade unless you require specific features contained in the new version. 4.1.6.3. If you have problems loading new firmware 4.1.6.3.1.
20、 Turn the amplifier off. Hold both encoders down and turn the amplifier on. This will force the amplifier into “bootloader” mode and allow you to re-send firmware. 4.1.6.4. Important notes about updating firmware 4.1.6.4.1. You should always update DSP and Display firmware at the same time, to the s
21、ame version level. Other combinations of Display and DSP firmware have not been tested together. 4.1.6.4.2. Updating the loader is not always required. When updating the loader, do NOT interrupt the AC mains or stop the process. 5. Troubleshooting and repair tips 5.1. All troubleshooting should begi
22、n with a careful assessment of the amplifier assembly. On all amplifiers, check and verify the following items: 5.1.1. Correct PWAs: All PWA numbers and versions are correct for the model amplifier you are repairing 5.1.1.1. Example: Check for IT8000 parts in an IT6000 or IT4000 5.1.1.2. Example: Ch
23、eck Lp/Ln coils for correct part number. IT4000 and IT6000 use the same coils, IT8000 uses different coils. 5.1.2. Firmware: 5.1.2.1. Verify firmware versions are V1.202 or higher. See Section 4.1.6. 5.1.2.2. Using front panel monitor menu or network connection, verify that amplifier model, serial n
24、umber, and date code match the product labeling and PWAs. 5.1.3. Cables: Visually and physically check that all cables and connectors are properly inserted and locked, not damaged. In addition, pay special attention to the following: 5.1.3.1. Check all ribbon cables for proper attachment of clamped-