Swr_sm_900_phantom_power_rework 电路图 维修原理图.pdf
-
资源ID:179383
资源大小:113.85KB
全文页数:2页
- 资源格式: PDF
下载积分:8积分
会员登录下载
三方登录下载:
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
|
Swr_sm_900_phantom_power_rework 电路图 维修原理图.pdf
SM-900 Phantom Power rework.doc 1 SWR SM900 Phantom Power rework instructions Caution: Disconnect AC power cord and all other cables before servicing. 1. Remove top cover and set aside. 2. (Optional step) Remove the four screws from the underside of the chassis that secure the rear heat sink/power module. Leaving the wires connected, move module aside. 3. (Optional step) Remove knob marked “XLR PAD” by pulling it firmly toward the rear. Unscrew the 7/16” nut and washer from the XLR PAD pot shaft and set pot aside, leaving wires connected. 4. Unsolder the 47uF capacitor from between the red wire and the solder pad marked “2” on the bottom preamp PCB. Save the capacitor. Re-solder the red wire to the pad marked “2”. 5. Unsolder the 47uF capacitor from between the black wire and the solder pad marked “3” on the bottom preamp PCB. Save the capacitor. Re-solder the black wire to pad marked “3”. 6. Unsolder the 1.5K resistor from pin 2 of the XLR. Solder the positive lead of one of the 47uF capacitors to the pin 2 of the XLR. Solder the negative lead of the capacitor to the 1.5K resistor. 收音机爱好者资料库 Ra d i o Fa n s .CN SM-900 Phantom Power rework.doc 2 7. Unsolder the black from pin 3 of the XLR. Solder the positive lead of the other 47uF capacitor to the pin 3 of the XLR. Solder the negative lead of the capacitor to the black wire. 8. Reinstall the XLR PAD pot; carefully dressing the capacitor and resistor leads. 9. Reverse steps 2 and 1. 收音机爱好者资料库 Ra d i o Fa n s .CN